----------------------------------------------------- Summary Notes of the SSWG meeting on the 03/12/2002 Present: G. Arduini, Ph. Baudrenghien, T. Bohl, R. Cappi, P. Collier, H. Burkhardt (secretary), K. Cornelis (chairman), B. Dehning, J. Gareyte, D. Manglunki, E. Shaposhnikova J. Tuckmantel, J. Wenninger. ----------------- Agenda : 1) Review of HRF long MDs in 2002 E. Shaposhnikova 2) TWC 200 MHz Hardware and Rephasing, results from last MD Ph. Baudrenghien 3) TWC 800 MHz T. Bohl ----------------- 1) E.S. reviewed the rf-related machine developments performed this year. There has been a substantial progress allowing to get close to the nominal longitudinal parameters for the LHC beam at injection energy: (4 sigma) bunch length of 1.6 ns and a (2 sigma) longitudinal emittance of 0.6 eV s were obtained at 450 GeV for 4 batches in the SPS. Besides improvements on the main 200 MHz rf control, feedback and bunch to bunch damping systems, the use of the 800 MHz rf as Landau cavity has been essential. A controlled blow-up on the flat bottom was achieved by a mismatch in the rf-voltage (capture in the SPS at 2 MV rather than 0.7 MV). See also the summary transparencies. 2) P.B. reported about the status of the 200 MHz travelling wave cavities, rephasing and synchronization for LHC injection. Feedback and longitudinal damping was improved. Longitudinal injection oscillations can be damped quickly. Transparent rephasing and automatic adjustments using training cycles were studied. See the transparencies. 3) T.B. reported about the 800 MHz travelling wave rf. The system is needed for stabilization of coupled bunch instabilities with frequencies outside the bandwidth of the longitudinal damper. For this purpose the cavities are used in bunch shortening mode. Although the requirements for control of rf amplitude and phase are less demanding in this mode than in bunch lengthening mode, the amplitude should be controlled to better than +/-10% and the 800 MHz phase to better than about +/-25 degrees. Beam loading is significant and can vary a lot along the batch, especially at flat bottom. There is a hardware improvement program.